- 1300 166 522
- sales@greenfrogroofing.com.au
- Inner West Sydney Specialist
Green Frog Roofing has recently completed the Leichhardt Job, a project that involved replacing the metal roof of a garage, installing a skylight, and replacing all gutters in the rear garage. The team at Green Frog Roofing worked tirelessly to ensure that the project was completed on time and to the satisfaction of the client.
The metal roof replacement was a significant part of the project. The team began by removing the old roof sheeting, which was worn and damaged. They then re-pitched the front roof and extended it to allow for an eave, which would provide additional protection against rain and wind. A new battening system was installed, which would provide a sturdy foundation for the new roof. The team then added Polynumb X-40 insulation, which would improve the energy efficiency of the garage by preventing heat loss in the winter and heat gain in the summer.
The new roof sheeting was carefully chosen to ensure that it was not only durable and long-lasting but also aesthetically pleasing. The team selected a color that would complement the existing color scheme of the garage and the surrounding buildings. The new roof sheeting was also designed to withstand the harsh Australian weather, including heavy rain, strong winds, and extreme heat.
To complete the metal roof replacement, the team installed a new flashing system. This would provide an additional layer of protection against water damage by ensuring that water could not penetrate the roof and enter the garage. The team took great care to ensure that the flashing system was installed correctly and that it would function as intended.
The skylight installation was also an important part of the project. The team supplied and installed a new dome-type skylight with a grey tint. This would allow natural light to enter the garage, providing additional illumination during the day and reducing the need for artificial lighting. The skylight was also designed to be energy-efficient, preventing heat loss in the winter and heat gain in the summer.
Finally, the team replaced all gutters in the rear garage. The old guttering was removed, and a new ACE mini line fast flow guttering system was installed. The new guttering was chosen for its durability and its ability to handle heavy rainfall. The team also used galvanised screw fixings with external brackets to ensure that the guttering was securely fastened to the garage.
In conclusion, the Leichhardt Job was a challenging project that required a high level of skill and expertise. The team at Green Frog Roofing was able to successfully complete the project, delivering a high-quality metal roof replacement, skylight installation, and gutter replacement.
The client was delighted with the results, and the team was proud of their work. If you are in need of a metal roof replacement, skylight installation, or gutter replacement, Green Frog Roofing is the team to call.